This series of pictures
show various temporary supports throughout the building. In some of the shots you can see
replacement steel beams. The picture with the blue wall (tv studio) shows
that the second floor entry and hallway will be wider.
|
|
|
A worker (unseen) is
pushing brick from the top of the doorway cutout into the
wheelbarrow.
|
|
|
These pictures show how the brick was placed to create heat
channels in the wall of the building
|
|
|
This is the backside of a
room heating vent
|
|
|
Just
below the vent Ron Salice the DCAM project manager shows the sophisticated
damper that controls the heat going to the vent.
|
|
|
These pictures show the
third floor at the south end of the building. Layers of old ceiling have
been removed but the floor still shows the outline of
offices.
|
|
|
The ceilings from the second floor are down but not out
|
|
|
Not many clues here but
where was this picture taken.
|